亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

From hills to hope

Water project drives development in the highlands of Lesotho

Updated: 2025-07-28 10:39
Share
Share - WeChat
Trucks transport components of the tunnel boring machine on a mountain road in Thaba-Tseka on July 8. YANG GUANG/XINHUA

The 38-kilometer tunnel will be excavated using two hard-rock shielded tunnel boring machines, operating simultaneously from Polihali and Katse Dam.

The first tunnel boring machine began boring from Katse earlier this year. On July 5, a launch ceremony was held for the second tunnel boring machine at the Caledonspoort Border Post in Butha-Buthe, Lesotho. This China-manufactured machine was shipped to Durban Port and assembled at the Polihali site. It is expected to significantly speed up excavation process to meet the slated 2028 completion date.

Speaking at the ceremony, South Africa's High Commissioner to Lesotho Constance Seoposengwe said she believed the new machine would give further impetus to the ongoing work on the project.

|<< Previous 1 2 3 4 5 6 7 8 9 10 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US