亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

  .contact us |.about us

Highlights ... ...
Search:
    Advertisement
Power generator begins trial operation at Three Gorges
( 2003-07-04 15:19) (Xinhua)

The No 2 generating unit in the Three Gorges Power Project started a 72-hour trial operation Tuesday morning. It is the project's first generator to generate power.

The No. 2 generating unit with a capacity of 700,000 kw was connected to the central China power grid. It is expected to provide 38.88 million kwh of electricity in 72 hours of trial operation to the power grid.

After the 72-hour trial operation, the generator will undergo a one-month period of examination before it is put into commercial use in early August.

Four 700,000-kw generators are scheduled to be operational this year at the Three Gorges.

Altogether 26 such power generators will be installed at the Three Gorges Power Project when it is completed in 2009. The world's largest power project is expected to generate 84.7 billion kwh of electricity a year.

   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved