亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/News

Tatay Hydropower Station prepared for power generation in Cambodia

Updated: 2013-07-29

The hydropower station in Tatay River, the largest water conservancy project undertaken by CGGC in Cambodia has entered critical construction phase.

The project department has refined the power generation procedure by developing a scientific construction plan and making careful construction arrangements to get fully prepared for power generation.

Up to now, the upward water tunnel was completed in early this year and the downward tunnel has finished 6,941 meters; the 4th tunnel has completed 696 meters of concrete floors on the upstream and downstream sides; the 6th tunnel intersection was half-finished, and 80 percent of the steel penstocks have been assembled and welded.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.