亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/News

CEEC begins to repair Dunai Dam in Angola

Updated: 2013-09-05

Aug 28 saw the commencement of CEEC-contracted repair of the Dunai River Dam in Benguela province, Angola.

The project is on the Dunai River in the suburb of Cubal city, Benguela province. Scheduled to be completed within 6 months, its main construction work includes dam reconstruction, repair of water-intake structures, river course clean-up, etc.

After the project is completed, the dam’s water diversion tunnel will be approximately 5 kilometers in length and will be connected to the diversion channel, through which river water will flow directly to Benguela to provide production water and domestic water for the urban area.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.