亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/Our Business/Equipment Installation

Installation of Bulb Tubular Turbine Generator Units at the Wangfuzhou Hydropower Station (China)

Updated: 2014-04-01

The Wangfuzhou Hydropower Station is equipped with four 27.25MW bulb tubular units to reach a total installed capacity of 109MW, generating 581 million KWH of electricity per year.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.